Replace Big Hill RWIS Oil Water Separator Tank with Concrete Tank GFE CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC
Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administr...
Replacement of A-Area Critical Fire Hydrant 3038 CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Re-supply of Electrical Loads Fed from 192-K & 183-3K CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fire Pumps Replacement at the K-Area Complex CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Prepare and Seal Exterior of Dry Room, Building 735-A CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Six Groundwater Monitoring Wells and Perform General Site Actions at the Bluewater Uranium Mill Tailings Radiation Control Act Site Near Grants, New Mexico CX(s) Applied: B1.3, B3.1 Date: 05/16/2012 Location(s): New Mexico Offices(s): Legacy M...
Dry Pipe Sprinkler Piping Replacement Projects CX(s) Applied: B1.3Date: 05/14/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Protection Upgrades Project CX(s) Applied: B1.3, B1.7, B1.27Date: 05/14/2012 Location(s): TennesseeOffices(s): Y-12 Site Office