254-19H Diesel Generator Dry Pipe Sprinkler Systems with Non-Continuous Obstructions CX(s) Applied: B1.3Date: 07/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 23, 2015254-19H Diesel Generator Dry Pipe Sprinkler Systems with Non-Continuous Obstructions
CX(s) Applied: B1.3
Date: 07/23/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Rework piping to add additional sprinkler heads and/or relocate existing sprinkler heads as necessary to meet NFPA 13 requirements.