Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 20-1 East Morrill Tap to Lyman 34.5 Kilovolt Transmission Line, Scotts Bluff County, Nebraska CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountai...
Utility Pole Treatment within the Savannah River National Laboratory Technical Area CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Transport and Perform TD&I on Big Hill TX-29 Transformer CX(s) Applied: B1.3 Date: 03/28/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Renovate 773-A B&C Wing Bathrooms CX(s) Applied: B1.3 Date: 03/28/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Bridgeport-Sidney 115 Kilovolt Line Rejected Pole Replacement CX(s) Applied: B1.3 Date: 03/16/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Coordinate Measuring Machine Research Project CX(s) Applied: B1.3, B1.4, B1.7, B1.27Date: 03/15/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Unneeded Materials and Chemicals Clean-out Project CX(s) Applied: B1.3Date: 03/15/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Facilities Infrastructure & Services Unneeded Materials and Chemicals Disposition Project CX(s) Applied: B1.3, B.127Date: 03/15/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Danger Tree Management on Estes-Pole Hill and Pole Hill-Flatiron 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 03/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region