Naselle-Tarlett #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Chehalis-Olympia #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Subcontractor Repair of Roof Leaks at 701-1K CX(s) Applied: B1.3 Date: 05/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pasco District Wood Pole Replacements (Multiple Lines) 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Washington, Washington, Oregon Offices(s): Bonneville Power Administration
North Bend District Wood Pole Replacements 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
Hawkins-Alvey Line Impairment CX(s) Applied: B1.3 Date: 05/08/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Emerald Ash Borer Control CX(s) Applied: B1.3 Date: 05/06/2014 Location(s): Illinois Offices(s): Argonne Site Office
Subcontractor Repair of Roof Leaks at 221-S CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fiscal Year 2014 Communication Site Engine Generator Replacements CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Oregon, Oregon, Washington, Oregon Offices(s): Bonneville Power Administration
Copper Mountain-Pilot Butte 34.5 Kilovolt Transmission Line Structure Pole Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region