Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Routine Activities at the Laboratory for Energy-Related Health Research (LEHR), California, Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): California Offices(s): Legacy Management
Routine Activities at the Site A/Plot M, Illinois, Decommissioned Reactor Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): Illinois Offices(s): Legacy Management
Routine Site Activities and Seismic Survey at Gnome-Coach Site, New Mexico CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): New Mexico Offices(s): Legacy Management
Replace the Roof on Building 235-F CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Rocky Reach-Maple Valley #1 Temporary Bridge Installation CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Cork Alternatives Project CX(s) Applied: B1.3Date: 02/06/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Flush Fire Water Distribution Lines to Remove Sediment CX(s) Applied: B1.3 Date: 01/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify Tank Return Header to Provide Hose Connection CX(s) Applied: B1.3 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office