Maintenance activity to clean/ unplug Outfall H-16 Diffuser at Upper Three Runs Creek (UTRC) CX(s) Applied: B1.3 Date: 05/01/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 705-K CX(s) Applied: B1.3 Date: 05/01/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 717-16K CX(s) Applied: B1.3 Date: 04/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install One Power Pole and Three Anchors Northwest of 704-1N CX(s) Applied: B1.3 Date: 04/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
2014 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
2014 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
Curecanti-Lost Canyon 230-Kilovolt Reconductoring Project CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
John Day Powerhouse-John Day Number 1-4 Conductor Replacements CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 12/10/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Raver-Covington Conductor Replacement CX(s) Applied: B1.3 Date: 04/24/2014 Location(s): Washington Offices(s): Bonneville Power Administration