Convert Leak Detection Boxes LDB-1A and LDB-2A at FDB-2 to modified LDB's CX(s) Applied: B1.3Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 16, 2015Convert Leak Detection Boxes LDB-1A and LDB-2A at FDB-2 to modified LDB's
CX(s) Applied: B1.3
Date: 06/16/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The drain header piping (1"-LD-211) from LDB-1A and LDB-2A has been cut and capped, and removed from service (P-DCF-F-00852) due to corrosion damage.