Buildings 12-64/12-84 Electrical Equipment Installation CX(s) Applied: B1.3, B1.15 Date: 07/25/2012 Location(s): Texas Offices(s): Pantex Site Office
Installation of Roofing System on L Area Complex Building, Sections +91 and +148 CX(s) Applied: B1.3 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hills Creek-Lookout Point No. 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Olympia-Grand Coulee Structure 85/5 Relocation Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Routine Maintenance Operations on Existing Facilities at Brookhaven National Laboratory CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): New York Offices(s): Brookhaven Site Office
Ostrander-Troutdale No. 1, Structure 16/1, Access Road Improvement Project CX(s) Applied: B1.3 Date: 07/18/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Remanufacture, Transport, and Install BHTX-29 Transformer CX(s) Applied: B1.3 Date: 07/17/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office