Place Rock Around Storm Water Drop Point to Help Prevent Debris from Entering Storm Water System CX(s) Applied: B1.3 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantle/Remove Vacuum System and Related Equipment in 772-F CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Asphalt Sealing of Parking Areas and Roadways at National Energy Technology Laboratory, Pittsburgh CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Zones 11 and 12 Steam Line Replacement CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Texas, Texas Offices(s): Pantex Site Office
Repair West Hackberry Brine Tanks, WHT-14 & WHT-15 CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to Bryan Mound Brine Tank CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
2012 Access Road Maintenance Along the Path 500 Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/24/2012 Location(s): California, California Offices(s): Western Area Power Administration
Replace Three Wood Poles-In-Kind at Bryan Mound West Gate CX(s) Applied: B1.3 Date: 08/23/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Security Upgrades Project CX(s) Applied: B1.3, B1.11Date: 08/22/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Security Upgrade Project (4598) CX(s) Applied: B1.3, B1.11 Date: 08/22/2012 Location(s): Tennessee Offices(s): Y-12 Site Office