Flaming Gorge - Vernal 138 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/21/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Casper Service Center Garage Door Insulation CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Building 922 Ice Melt/Heat Trace Project CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Replace Sparge Piping at Bryan Mound Raw Water Intake Structure CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Access Road Improvement For the Kalispell-Kerr Number 1, 115-kilovolt (kV) Transmission Line CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Site-Wide Painting Project at National Energy Technology Laboratory CX(s) Applied: B1.3 Date: 09/17/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Morgantown Parking Garage Fire Alarm System CX(s) Applied: B1.3, B1.7, B1.15, B2.5 Date: 09/13/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Hesperus- Montrose 345 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Danger Tree Management on North Fork to Rifle 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region