McNary-John Day Transmission Line Mile 34-38 Access Road Repair Project
CX(s) Applied: B1.3
Date: 02/09/2016
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to repair approximately 3.2 miles of access road between miles 35 and 38 along the McNary-John Day No. 2 500 kilovolt (kV) Transmission line that were damaged during a storm event.