Copper Mountain to Boysen 34.5 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 01/11/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Building 4 Drain Line Replacement CX(s) Applied: B1.3, B1.15, B1.31 Date: 01/08/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Video Inspection of Bryan Mound 36-inch Raw Water Pipeline CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 01/03/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project
723-A Distribution Panel 4 (DB4) Replacement CX(s) Applied: B1.3 Date: 12/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8 Date: 12/19/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration
Repair and Line Bryan Mound Brine Tank, BMT-1 CX(s) Applied: B1.3 Date: 12/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office