2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Shipping Containers 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Contamination Area Cleanup Project (4596) CX(s) Applied: B1.3 Date: 06/25/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
L-Area River Water Valve V-022 Bypass and Piping CX(s) Applied: B1.3 Date: 01/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
242-16H Evaporator Acid Cleaning Process CX(s) Applied: B1.3 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Blast and Paint West Hackberry, Texas 22 Header Piping CX(s) Applied: B1.3 Date: 01/23/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Lusk Rural Substation Control Building Construction CX(s) Applied: B1.3 Date: 01/16/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 01/15/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region