Categorical Exclusion Determinations: B1.3

Franklin-Badger Canyon #2 & Walla Walla-Pendleton #1 Wood Poles CX(s) Applied: B1.3 Date: 04/30/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration
Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Co...
Building 26 Air Handlers and In-Line Return Fans Replacement CX(s) Applied: B1.3, B1.22, B.1.31 Date: 04/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Curecanti-Poncha 230 Kilovolt Transmission Line Cross Bar Ranch Project CX(s) Applied: B1.3 Date: 04/25/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Danger Tree Management on Curecanti-Crystal, 115 Kilovolt Transmission Line Danger Tree and Vegetation Management CX(s) Applied: B1.3 Date: 04/25/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Herbicide Application at Lone Butte Substation During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/24/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Hydrogen Peroxide Treatment of Strategic Petroleum Reserve Heat Exchangers BOA CX(s) Applied: B1.3 Date: 04/23/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to West Hackberry Brine Tanks, Government Furnished Equipment CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to West Hackberry Brine Tanks CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office