Nogales Substation Temporary Laydown Yard CX(s) Applied: B1.3 Date: 03/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
685-G Par Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections CX(s) Applied: B1.3 Date: 03/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Libby-Troy Access Road Upgrades CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Buckley-Marion Overhead Groundwire Replacement Project CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
707-C Roof Replacement CX(s) Applied: B1.3 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Repair Sanitary Sewer Line South of 725-N CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Provide an Improved Heating, Ventilation and Air Conditioning System in 705-A CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office