Transmission Insulator Structure Replacement on the HVRMED #2 CX(s) Applied: B1.3Date: 04/28/2016 Location(s): NevadaOffices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
April 28, 2016Transmission Insulator Structure Replacement on the HVRMED #2
CX(s) Applied: B1.3
Date: 04/28/2016
Location(s): Nevada
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration will be conducting transmission structure insulator replacement on the HVRMED #2. The work will be from structure 0-1 to 9N4.