Building 720-2A Chiller Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Morgantown Parking Garage Fire Alarm System CX(s) Applied: B1.3, B1.7, B2.5 Date: 08/08/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Power Monitoring System Installation CX(s) Applied: B1.3, B1.15 Date: 08/08/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Algaecide Use at Wastewater Treatment Facility - Amendment 01 CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Texas Offices(s): Pantex Site Office
Pave a Parking Space Near Building 730-A CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office