Categorical Exclusion Determinations: B1.3

Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office