B-922 Roof Replacement CX(s) Applied: B1.3, B1.15, B2.1Date: 09/22/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200) CX(s) Applied: B1.3Date: 09/21/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Subcontractor Will Provide Roof Repairs at 192-2K CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 108-2K CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install 480V Welding Receptacle in 250-S (Glass Waste Storage Building
Subcontractor to Repair Roof Leaks at 766-H CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dome-Wellton-Mohawk-Ligurta Line Maintenance CX(s) Applied: B1.3Date: 09/14/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Subcontractor Will Provide Roof Repairs at 707-C CX(s) Applied: B1.3Date: 09/10/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 722-5A CX(s) Applied: B1.3Date: 09/10/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
702-L and 702-K Correct/Reseal Foundation Flashing on Telecom Facility CX(s) Applied: B1.3Date: 09/10/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office