Fire Department Personnel to Perform Annual Flow Testing of Hydrants and Curb Boxes in B-Area CX(s) Applied: B1.3 Date: 04/10/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Rosedale-Willowby-Kiowa Creek 115-Kilovolt Transmission Line Wood H-Structure Replacement CX(s) Applied: B1.3 Date: 04/10/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Saltstone Disposal Units 2, 3, and 5 Grout Line Modification CX(s) Applied: B1.3 Date: 04/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Marion-Alvey Marion-Lane Insulator Replacement Project CX(s) Applied: B1.3 Date: 04/07/2014 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Chehalis-Mayfield Number 1 Line Impairment Structure Replacements CX(s) Applied: B1.3 Date: 04/03/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Building 4 FSARS CX(s) Applied: B1.3 Date: 04/02/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
S8G Prototype Refueling Overhaul CX(s) Applied: B1.3, B1.5, B1.7, B1.14, B1.30, B1.31, B2.1, B2.4, B2.5, B6.3 Date: 04/01/2014 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Liberty Substation - Vegetation Management CX(s) Applied: B1.3 Date: 04/01/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
773-A, E114 Roof Replacement CX(s) Applied: B1.3 Date: 03/24/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 703-1B CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office