773-A, E114 Roof Replacement CX(s) Applied: B1.3 Date: 03/24/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 703-1B CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 720-H CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Roof Removal and Replacement at +34 and +38, K-Area Materials Storage Building CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 717-K CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
HB-Line Security Upgrades CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Replace Heating Ventilation and Air Conditioning Unit for Room D-007 in 735-A CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 709-1G CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-1B CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office