Nuclear Facilities Risk Reduction (JFRR) (4457 Rev.1) CX(s) Applied: B1.3, B5.2, B5.4, B1.31, B1.27Date: 09/03/2015 Location(s): TennesseeOffices(s): Y-12 Site Office
Wautoma-Ostrander No. 1 Upgrade Project CX(s) Applied: B1.3, B4.6Date: 09/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Benton-Franklin #1 and Benton-Franklin #2 Wood Pole Replacement CX(s) Applied: B1.3Date: 09/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Replace Bryan Mound Crude Oil Closed Drain System at Meter Skid (BM-MM-805) CX(s) Applied: B1.3Date: 08/31/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Prepping/Painting Exterior Walls of 105-K, 704-K CX(s) Applied: B1.3Date: 08/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 713-2N CX(s) Applied: B1.3Date: 08/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor will provide roof repairs at 713-2N. CX(s) Applied: B1.3Date: 08/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Replace the Roof at 702-H CX(s) Applied: B1.3Date: 08/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Prepping/Painting Exterior Walls of 105-K, 704-K CX(s) Applied: B1.3Date: 08/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Wall Repairs at 773-52A CX(s) Applied: B1.3Date: 08/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office