Replace 730-2B Roof CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Investigate Possible Damage Under Roadway Depression Caused by Crane Outrigger CX(s) Applied: B1.3Date: 41796 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Sawmill Creek Stream Bank Erosion CX(s) Applied: B1.3 Date: 06/06/2014 Location(s): Illinois Offices(s): Argonne Site Office
The U.S. Department of Agriculture Forest Service - Slow the Spread of Gypsy Moth CX(s) Applied: B1.3 Date: 06/06/2014 Location(s): Illinois Offices(s): Argonne Site Office
Liberty-Westwing 230 Kilovolt Transmission Line Insulator Replacement CX(s) Applied: B1.3Date: 41795 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Kayenta-Navajo 230-kilovolt Transmission Line Landing Construction and Insulator Replacement, Navajo County, Arizona CX(s) Applied: B1.3 Date: 06/05/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Rocky Mountain Region
Replace Antifreeze in Sprinkler System F-wing Loading Dock CX(s) Applied: B1.3Date: 41793 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Amargosa Substation (Conduit and Storage Pad Installation) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Flaming Gorge Microwave Site Communications Building Access Road Repairs, Daggett County, Utah (Amended) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Hood River-Coop Service #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Oregon Offices(s): Bonneville Power Administration