Southwestern Power Administration proposes to construct two berms inside the station and spread new gravel.…
Install Condensate Release Valves on 108-1K Compressed Air System CX(s) Applied: B1.3 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Longview-Chehalis #3 Transmission Structure Footing Repair CX(s) Applied: B1.3 Date: 06/12/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Telecommunications Facilities Rehabilitation CX(s) Applied: B1.3 Date: 06/11/2014 Location(s): Washington, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration
Flagstaff Pinnacle Peak #1 & 2 Transmission Lines - Slid Static Damper Repair at Structures 134/3 & 139/2 CX(s) Applied: B1.3 Date: 06/11/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Subcontractor to Repair Roof Leaks at 246-H CX(s) Applied: B1.3Date: 41801 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair/Reseals Concrete and Asphalt Covers at R- Reactor Seepage Basin CX(s) Applied: B1.3Date: 41801 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 722-5A CX(s) Applied: B1.3Date: 41800 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Categorical Exclusion Determination
Replace roofing system at 702-F CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office