Cowlitz Tap Rebuild and Access Road Maintenance CX(s) Applied: B1.3, B1.24, B4.13 Date: 06/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Danger Tree Management on Gore Pass-Hayden 138-kilovolt Transmission Line, Grand and Routt Counties, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Danger Tree Management on Craig-Rifle 230-kilovolt Transmission Line, Moffat, Rio Blanco, and Garfield Counties, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rock...
Danger Tree Management on Blue River-Gore Pass 230-kilovolt Transmission Line (Amended), Grand County, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Roof Leaks at 221-H (Truckwell Airlock) CX(s) Applied: B1.3 Date: 05/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Building 130 CX(s) Applied: B1.23, B1.3 Date: 05/28/2014 Location(s): New York Offices(s): Brookhaven Site Office
Purchase of West Hackberry Gate Valve Replacement Parts CX(s) Applied: B1.3 Date: 05/27/2014 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Perform Annual Flow Testing of Hydrants, Curb Boxes, and Fire Tank Systems in B-Area CX(s) Applied: B1.3 Date: 05/22/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Deering Lake-Eckley 115 Kilovolt Transmission Line Structure Replacements, Yuma County, Colorado CX(s) Applied: B1.3 Date: 05/19/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Boysen-Thermopolis 115 Kilovolt Transmission Line Structure Replacement Project, Hot Springs and Fremont Counties, Wyoming CX(s) Applied: B1.3 Date: 05/16/2014 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain ...