Categorical Exclusion Determination
Office of NEPA Policy and Compliance
February 28, 2017Install riprap on the upstream and downstream slopes of Pond C Dam between the existing riprap and the guard rails. The approximate width of the riprap addition is eight to 10 feet and the length is 1,350 feet.