617-G Replace floor tiles.…
Scope-Clean oil spill in 715-3N fuel dike and repair pressure control device.…
789-B Repave Driveway…
Repair and seal the south wall of 713-3N.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8. …
Paint 158B Panel at 281-2H.…
Remove/replace broken windows.…
Subcontractor will provide roof repairs at 773-42A. …
Bonneville Power Administration (BPA) proposes to replace insulators, remedy impairments, improve access roads, and install fall protection along t…
Provide labor, materials, services, and supervision to recoat the interior and exterior of the 787-001G elevated fire water storage tank in accorda…