This EEC covers various general renovations for Building 773-A A-wing in non-radiological areas. Scope includes D and R such as replacing refrigera…
Remove space heaters from service.…
Remove Abandoned Unloading and Conveying System (UNLD) associated piping and pipe supports to allow personnel access to the safety shower at Bldg. …
703-46A and 703-41A Modification to entry gate at 703-46A and 703-41A.…
Subcontractor will provide roof repairs at 707-C. The Subcontractor "will not" disturb the existing roof while performing these repairs on 707-C.…
Subcontractor will provide roof repairs at 705-C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-C.…
Replace EQ Pump 001 at 607-16K.…
Tank Farm to Defense Waste Processing Facility Interarea Waste Transfer Line Cathodic Protection System is to be removed.…
Controls for the Pour and Drain Turntable are to be migrated to the Delta-V Distributed Control System.…
Subcontractor will provide roof replacement at 702-T.…