Paint Fire Water PIV/Hydrants in N-Area.…
713-2N Replace damaged section of floor plate.…
Construction forces will perform maintenance on Milling machines and Lathe(s) as needed in 717-F.…
Perform cleaning, surface preparation, coating and Touch-Ups of Melter Storage Box No. 3 (MSB No. 3) by subcontractor.…
703-23B Repaint Centerra dog kennels.…
Perform renovations in Building 735-A, Rooms A-125 (office), A-143 (lab), and Lab 151.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
The subcontractor shall provide all equipment, material, labor, and supervision for repairing culvert over NPDES Outfall H-07.…
Vendor will clean Weapons Cleaning Facility 617-10G.…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts transmission and distribution line structure replacements in se…