Defense Waste Processing Facility (DWPF) removal and replacement of Regulated Drains Collection Tank (RDCT) Sump Pump.…
703-1B Room E56 Replace Door and Frame.…
This activity is to remove presumed asbestos insulation from the 12.3 to 13.1 moisture separator and P-Trap.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structure 46/6 on the Gore Pass-Hayden (GOT-HDN…
This activity is to remove the presumed asbestos insulation on the steam line downstream of STM-342 (V-342).…
704-N Paint offices 5, 5A, and 5B.…
Paint Fire Water PIV/Hydrants in N-Area.…
713-2N Replace damaged section of floor plate.…
Construction forces will perform maintenance on Milling machines and Lathe(s) as needed in 717-F.…
Perform cleaning, surface preparation, coating and Touch-Ups of Melter Storage Box No. 3 (MSB No. 3) by subcontractor.…