The system will be upgraded, fully replaced, or enhanced.
Design and Procure a new and more reliable TCON Process Chillers for Building 233-H. The existing two TCON process chillers shall be Dismantled and…
Design and Procurement of Replacement Glovebox Oxygen Monitoring Alarm Panel in the Central Control Room of Building 233-H.…
Evaluate/correct a brine solution leak at V-2261 in the chill water line for the office air handling unit at HB-Line soft structure.…
Melt cell high pressure sodium (HPS) light replacement with LED light for increased visibility.…
Cell Covers for underground locations at 105-C such as the Storage Tank Room, Heat Exchanger plugs will be cleaned and resealed. This is a routine …
Install Copper Cable and Fiber Optic Cable to 727-5N.…
Remove a section of the ductwork, metal duct tray and supports in 711-N IronWorkers Shop.…
Legacy research materials in 737-A, 772-25B, and 737-G will be inventoried, characterized, and disposed of accordingly. Transportaion of material t…
703-46A Correct Storm Water Intrusion.…