Utilization of aerial drone to apply herbicide to the roofs of 105-P and 105-R as part of normal post-closure maintenance.…
The Site Services HVAC Maintenance group will set-up a used oil storage area in an outdoor shed at Building 711-C.…
The H-Canyon air cooling units, appliance Nos. HCA-HS-222100-CHW-CHU-001 (McQuay Chiller No. 1) and HCA-HS-22100-CHW-CHU-002 (McQuay Chiller No. 2)…
Subcontractor to provide labor, tools, equipment, transportation and supervision to cut trees, brush, and grass for approximately 15 miles long by …
BPA proposes to perform road stabilization work on approximately 14.5 miles of access roads between miles 25 and 39 that were used during the Cold …
HVAC Chiller No. 1 cooling water vent valve is to be replaced with a lighter one and pipe hangers are to be reinforced.…
Repair reinforced concrete wall located at the east side of 730-4B building.…
Repair damaged portion of the roof on the west end of building 710-8N.…
Weld repairs and coating on door hinges on the north east end of 711-6N.…
Replace the current A/C unit for Conference Room a with a new Carrier 3-Ton split HVAC unit.…