Degraded wooden decking near the 294-F Sand Filter will be removed and replaced with new wooden or composite decking.…
The Proposed Activity (PA) is M-DCF-H-13504, Redesign 233-H AHU Steam Supply and Condensate System, and Work Order (WO) 1693883.…
Design and Procurement for replacement of the Glovebox In-line Oxygen Monitor System for HANM PRIMARY STRIPPER No. 1.…
Design and Procurement for replacement of the Glovebox Oxygen Monitor System for HANM PRIMARY STRIPPER No. 2 In-line Oxygen Monitor.…
BPA proposes to perform routine road maintenance, repair, improvements and reconstruction on approximately 1.3 miles (7,000 linear feet) of access …
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
Install additional recepticals and replace flooring in 730-A Rm167.…
HVAC Chiller No. 1 and No. 3 cooling water vent valves are to be replaced with lighter ones and pipe hangers are to be reinforced.…
Paint Fire Hydrants and PIV's in F-Area.…
709-1G, Replace tile and wallboard in ladies shower.…