The EEC evaluates the chemical cleaning process to remove the scale deposits from the 242-16H (2H) evaporator pot using nitric acid and in-pot neut…
Install new roofing system on Building 167…
Replace the exterior siding and roof.…
Perform habitability improvements at 710-14N per the attached SOW.…
Apply coatings to the roof of the occupied/office area section of 713-1N, seal leaks and repair the gutter on the north sde of 713-1N.…
Replace MPC 13Ton Power Cable due to contamination.…
Subcontractor will provide roof repairs at 707-F.…
Bonneville Power Administration (BPA) proposes to remove and replace marker balls on two transmission lines in Modoc County, California. As part of…
The activity is to install a new shower and vanity sink at 704-3N.…
Augusta Industrial will suck/pump slurry sediment from the 285-H basin cells and transfer to a de-watering box. The dry sediment will be transferre…