The roof on 105-L over the dissassembly basin will be removed and replaced.…
This activity will be performed per work order (WO) 1397510 and WO 1755942.…
Activity is paving small areas within the SRNL Limited Area.…
Evaluate/correct refrigerant leak in 735-A, D-160 Unit.…
702-A power upgrades and receptacle installation.…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision to gas free, clean and in…
Redevelop the PAR Pond Dam Emergency Spillway.…
Clean and pressure wash the bird droppings at cylinder shed (731-6N).…
Refurbish restrooms in 704-49S.…
Contractor to clean/dispose of bird droppings located in 722-4A.…