The following elements are to be funded under a five-year Cooperative Agreement between the Tribes and the U.S. Department of Energy (DOE): salarie…
Transmission and Distribution Line Structure Replacements…
Benton-Scooteney No. 1 Transmission Line Rebuild…
The Kesselring Site Building 11 UHS project consists of multiple phases: 1 b, 2, 3, and 4.
735-4B Shield Door Track Maintenance…
Weld Test Cell Camera Replacement…
Troubleshoot, Repair and/or Replacement of Light Fixtures in Non-radiological Areas in L-Area…
Install 7 UW drops in 706-4F Room 103…
Install UW Drops in 706-3F Rooms 141, 142, and 144…
Repair Partition Wall and Broken Tile in the Men's Restroom in 617-8G…