Replace water fountains inside SRNL buildings in the limited area.…
704-1N Remove floor tile and coat floor.…
The EEC covers the renovations to the interior of building 717-F.…
Renovations will be done in building 772-26B.…
LM is proposing installation of a new underground water line, beginning on a private rancher’s property northeast of the Bear Creek disposal site a…
Subcontractor shall provide transportation, tools, test and repair equipment, supplies, facilities, labor, and technical supervision to perform wor…
Bonneville Power Administration (BPA) proposes to clean-up bat and rodent biomass for example, bat guano, rodent feces, expired animals, etc.) from…
Current activities include inspection of the site and follow-up vegetation surveys to ensure that the area is meeting vegetation success criteria.…
WAPA proposes to replace spacers on spans along the ODA-TCY transmission line.…
Remove wire and conduit between MCC 7 and Disconnect 7.06. Plug up holes left from the removed conduit.…