The purpose of this project is to return the emergency spillway at PAR Pond to as close to its original design configuration as feasible. The area …
Due to normal age and wear, five steam poles have been identified for replacement. Parts are direct replacements. Steam poles will be replaced util…
766-H Building renovations.…
Subcontractor shall provide labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision to perform work in …
Contractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services necessary to perfo…
Chilled Water Pump Replacement K-Area.…
Air gap 285-H steam turbine exhaust feed to 284-H.…
This EEC covers the trouble shooting and repair of Welding Exhaust Fan No. 2 at 717-3N.…
Modify Plant Airline and install equipment in 717-F machine shop…
This EEC covers various general renovations for Building 735-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, paintin…