This replacement will result in a reduction of maintenance needs for the UPS units.…
Painting in the interior and exterior of 701-2K.…
Remove approximately 10 feet of insulation on caustic line to identify and repair caustic leak.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its North Gunnison-Skito (NGU-SKO) 115-kV Transmission Line.
The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Remove insulation on caustic line to identify and repair caustic leak.…
Make emergency repairs on the Strategic Petroleum Reserve (SPR) system site piping, offsite pipelines, or other designated systems.
Replace 218-1H Overhead Door with Roll-Up Door.…
This modification will replace the existing 234-H FACP with the manufacturer’s suggested replacement panel that will provide compatibility with all…
The DCF outlines some caustic delivery improvements to 221-H through piping modifications and repurposing.…