Install UW drops for cubicle replacement in 703-43A.…
C. E. Bourne Subcontractor will provide roof repairs at 701-2L. The Subcontractor will not disturb the existing roof while performing these repairs…
This EEC is for the placement of grout inside manhole P5 of the abandoned process sewer line north of 211-H.…
The 786-5A Trailer is an older structure (Occupied) and needs all the windows repaired from water intrusion by leaking windows. Additional building…
Remove and replace the damaged retention pond drain system and clean out the accumulated debris within the pond.…
Demolish and remove (D and R) 719-H South (front) and West (side) exterior double doors, frames (if needed), and lock assemblies.…
There is currently an installed Breathing Air (BA) header that feeds in portable BA through the hatch wall and ceilings to various locations in the…
Design, fabricate, and install one new Non-Nuclear Reconfiguration (NNR) Calorimeter to replace the NNR in 234-H. The NNR Calorimeter has been in s…
Building 233-H Doors 301/08 are old and heavy, and their hinges require frequent maintenance.…
H-12 chemical addition system corrective maintenance. Humate is added to H-Canyon NPDES H-12 flow prior to discharging through Outfall H-12. The ma…