Load Center-B1 will be taken out of service for Preventative Maintenance.…
Demolition and disposition of bldg. 703-1B uninterruptible power supply.…
Augusta Industrial to pressure wash internal cooling tower basin at 285-11F.…
Remove suspect asbestos material from metal 291-H Breech House and concrete stack joint.…
Remove suspect asbestos material from metal 291-H Breech House and concrete stack joint.…
Repair, prep, and paint interior walls at 704-N.…
The Shielding Blocks are being removed from the Saltstone Facility Process Room.…
Like for like replacement of two A-wing Sump pumps and associated controls and supports.…
Replace the 105-L Chiller Unit and system waster pump per MT-LCR-2021-00002.…
For reliability and to minimize cost, the existing MG sets will be replaced by two new solid-state battery chargers.…