Scope of work includes installing Medintech flooring, and base molding. Also clean/prep and apply paint to the ceiling, walls, doors, cabinets as n…
Damaged floor and tile will be removed and replaced in 704-28E.…
Prep and paint walls in the 704-59E Conference Room.…
The 291-F stack isokinetic sampling rake will be cleaned by flushing air through it.…
This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…
This activity is for preventative maintenance (PM) of air handling units in room 212 of 735-B.…
Paint doors on 4th level of H-Canyon to repair scratches as needed.…
Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…
The jockey pump controllers associated with the fire pumps in F and B Areas will be replaced to maintain proper system function.…
The Room 75 Vault Doors have outlived their useful service life and will be replaced with a new door.…