The DCP outlines some caustic delivery improvements to 221-H through piping modifications and re-purposing.…
Painted striping in areas in H-Canyon for repainting or encapsulation.…
Activity will prep, paint, and seal roof flashing and wall on the South and East side of the E-004 Roof and sealing joints in wall panels, and roof…
Install new cabinet and countertop at 784-7A.…
Paint building exterior at 251-F.…
Paint building exterior at 251-H.…
Subcontractor will provide roof repairs at 719-5N.…
Installing new door in 773-A, A-Wing.…
773-62A Sand and paint handrails on steps at trailers.…
This EEC covers general renovations and modifications to C and B Wing in 773-A.…