Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with SRS asbestos group.…
The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…
Installation of Insulation on Saltstone Salt Solution Receipt Tank Process Vessel Vent System Exhaust…
Remove paint from 2 in. carbon steel pipe 25 lb. oxygen header located in D-0101 (Glass Shop) per Work Order 1913362 to prepare pipe for Lockring c…
Bonneville Power Administration (BPA) proposes to allow various telecommunications companies to upgrade their wireless network antennas and equipme…
Install two doors and build walls to hold the doors.…
The DCP outlines some caustic delivery improvements to 221-H through piping modifications and re-purposing.…
Painted striping in areas in H-Canyon for repainting or encapsulation.…
Activity will prep, paint, and seal roof flashing and wall on the South and East side of the E-004 Roof and sealing joints in wall panels, and roof…
Install new cabinet and countertop at 784-7A.…