Upgrade the communications/server room with clean fire suppressant system,HVAC units, fire and HVAC controls,and raise floor for fire suppressant s…
Upgrade the communications/server room with clean fire suppressant system, HVAC units, fire and HVAC controls, and raise floor for fire suppressant…
Upgrade the communications/server room with clean fire suppressant system, HVAC units, fire and HVAC controls, and raise floor for fire suppressant…
Bonneville Power Administration (BPA) proposes to remove structure 3/10 and to replace structures 3/9 and 4/1 on the 115-kilovolt (kV) Ellensburg-M…
To maintain reliable power in the region, Bonneville Power Administration (BPA) proposes to perform in-kind replacement of five wood pole structure…
The Bonneville Power Administration (BPA) plans to perform road maintenance to improve and construct access roads and install new landings for the …
The Western Area Power Administration (vi APA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the …
Kansas City National Security Campus (KCNSC) and New Mexico Operations (NMO) – Routine Operating and Administrative Activities (ROAA) – NCR: KCNSC2…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
Design, fabricate, and place into service new disposable waste containers capable of being connected to a glovebox at the transfer container airloc…