Fabricate and install crossover ramps on the roof of Building 221-F at expansion joints.…
Enhancements to be done in 704-K via removal of wallpaper from certain building hallways/corridors where needed, and applying paint, etc.…
Subcontractor will provide roof repairs to K-Area 918 Fan.…
Additional FEDNET Communications Data Drops will be installed in 105-K.…
Seal the near side handball court, 191-L access plugs and entry hatch cover to prevent water intrusion into the building.…
Remove and replace insulation on steam lines in L-Area.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8.…
Blanks will be installed downstream on the outlet valves of third level head tanks (12A, 12B, 13B, and 13C) to prevent solvent from leaking through…
This EEC cover the Project design and Procurment of a new 13.8 kV Unit Substation to be situated near the existing 233-H Supply Fan Air Handling Un…
Out-of-service HVAC Equipment in 701-1K Room 15 will be removed and replaced with new HVAC equipment.…