The subcontractor shall replace wooden line ties from the railroad bed, identified by site transportation and engineering as part of the 2022 scope…
Vacuum pump oil change at 999-1W.…
Run copper cable from 719-5N to 704-199N.…
Fabricate and install crossover ramps on the roof of Building 221-F at expansion joints.…
Enhancements to be done in 704-K via removal of wallpaper from certain building hallways/corridors where needed, and applying paint, etc.…
Subcontractor will provide roof repairs to K-Area 918 Fan.…
Additional FEDNET Communications Data Drops will be installed in 105-K.…
Seal the near side handball court, 191-L access plugs and entry hatch cover to prevent water intrusion into the building.…
Remove and replace insulation on steam lines in L-Area.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8.…