Central Plateau Cleanup Company (CPCCo) and its subcontractors perform routine maintenance activities and custodial services for buildings, structu…
Subcontractor will perform work to replace and repair the roof on Building 706-2F.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitor's parts in the Tritium Extraction F…
Domestic Water Line Valve HQ-234000-DW-V-80.018 (provides make-up water for 218-2H Cooling Tower) will be corrected/replaced.…
Fabricate and replace the existing guardrails on the dock at 713-2N. Guardrails will be fabricated in the shop. The existing concrete will require …
Apply cool seal (Ames Maximum Stretch Coating) to trailer roofs and touch-up interior paint.…
The EEC covers painting of the stairways and exterior doors to 713-1N.…
A hose-in-hose transfer line will be routed from an existing manifold in the Tank 10 Center Riser to Tank 11 Riser 2.…
Replacing existing centrifugal switches for the 238-H Exhaust Fan A (53.001-A) with a new speed switch.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform routine maintenance activities and custodial services for buildings, …