The scope of the project includes modifying the current electrical system to manage the electrical loads more efficiently.
The contractor shall provide all materials, labor, tools, equipment, consumables, services, transportation, storage, and supervision necessary to p…
The disposal site would continue to be visually inspected on an annual basis.Monitoring includes surveying to generate and maintain spatially accurate data. Monitoring also includes inspecting or exchanging radiological monitoring devices…
Replace B16 roof and install french drain on the North and West sides of the building.…
All activities pertain to the addition, removal or replacement of equipment located in Diffuser (DI) Glovebox T105-301-1, Cabinet 2, in Room 17 ofB…
Install a Pressure Monitoring/ Relief Stations for legacy portable Z-Beds (aka Torpedoes) in the Tritium Facilities per M-DCF-H-13743.…
The existing water heater in Room 121 is being replaced with a similar model.…
Replace the existing Mercury Cabinet (HV-HOOD-2), Collection Tank (WEE-COL-1) and associated components and piping/tubing.…
703-23B Repaint Centerra dog kennels.…
Remove space saver and install 6 new modular cubes in 730-4B.…