Recovering refrigerant from non-radiological appliances in L-Area that contain less than 5lbs refrigerant at full charge.…
Occasionally, the vacuum lines in the 735-B hood systems need to be repaired with new lines due to normal wear and tear.…
Bonneville Power Administration (BPA) proposes to remove and replace certain fittings used to splice lengths of transmission line cable together on…
The existing gravel road around the E-Area Trailer Complex will be paved.…
717-F Annex renovations.…
The obsolete recloser on H3B feeder is reaching the end of its life cycle and should be replaced.…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Mission Completion (SRMC) …
Subcontractor will provide roof replacement on Buildings 713-2N, 713-3N, and 731-2N.…
Conduct repairs to gypsum board credited firewalls in 735-B.…
Subcontractor will provide main roof replacement at 151-2C.…