This EEC covers various general renovation activities for Building 773-42A. Scope includes D and R such as replacing sink, associated piping and el…
This activity involves the installation of external oil sampling ports on various electrical transformers throughout SRS.…
Existing wooden entry stairs and landing platforms at buildings 718-N and 718-20N were removed and replaced with metal/aluminum units.…
The scope of work will include general renovation activities as deemed necessary in addition to installing/replacing windows sun shield or tint.…
This scope is to support the leak / low pH in the sewer drain lines leading to the H-12 Outfall. Water from standpipe will be pumped into P10B.…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
E-DCP-H-18007 is for the replacement of Motor Control Center (MCC)-J.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Torrington-Lingl…
Construction is to patch holes in the flooring in fan motor compartment of AHU No. 1 and No. 2.…
The backflow preventer is located in the 285-4F courtyard. A replacement is available on site and will be utilized for the repair.…