Kansas City National Security Campus (KCNSC) and New Mexico Operations (NMO) – Routine Operating and Administrative Activities (ROAA) – NCR: KCNSC2…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
Design, fabricate, and place into service new disposable waste containers capable of being connected to a glovebox at the transfer container airloc…
Reconfigures Loading Line 6 (LL6) to improve loading efficiency…
The Building 233-H Special Container Loading/Unloading (SCLU) Stripper Valve Replacement outage consists of the following activities: 1. Replace th…
The Hot and Cold Nitrogen (HCN) System Pressure Relief Valves (PRVs) are replaced every 48 months per Preventive Maintenance (PM) Work Orders.…
Due to constraints on parking spaces in the original ETP parking lot, overflow parking needs to be established.…
N Area exterior renovations to rinse, seal, and paint exterior walls on buildings as listed in the detailed descripition.…
Perform planned maintenance/renovations on the interior walls, floors, windows and doors of buildings 711-N, 711-2N,
713-1N Paint Storage for Others (SFO) office area walls and install carpet in room N241…