Reconfigures Loading Line 6 (LL6) to improve loading efficiency…
The Building 233-H Special Container Loading/Unloading (SCLU) Stripper Valve Replacement outage consists of the following activities: 1. Replace th…
The Hot and Cold Nitrogen (HCN) System Pressure Relief Valves (PRVs) are replaced every 48 months per Preventive Maintenance (PM) Work Orders.…
Due to constraints on parking spaces in the original ETP parking lot, overflow parking needs to be established.…
N Area exterior renovations to rinse, seal, and paint exterior walls on buildings as listed in the detailed descripition.…
Perform planned maintenance/renovations on the interior walls, floors, windows and doors of buildings 711-N, 711-2N,
713-1N Paint Storage for Others (SFO) office area walls and install carpet in room N241…
713-1N Renovate kitchen and adjoining office area.…
Proposed activity (PA) is to remove old door and frame in 773-A, E-101 and replace it with a new 90-minute fire door and frame.…
Proposed activity (PA) is to repair broken stucco and seal wall at 773-A per Work Order (WO) 01921695.…