Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road maintenance on existing roads used t…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Salida-North Gunnison (SLA-NGU) 115-kV Transmission Line.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Salida-North Gun…
Bonneville Power Administration (BPA) proposes to utilize a helicopter-slung saw/grapple device (“heli-feller”) to remove the tops of approximately…
Bonneville Power Administration (BPA) proposes to prune (“side-limb”) trees along approximately 23 miles of the 230-kilovolt Addy-Cusick No. 1 tran…
Replace light fixtures with LEDs at 711-N, 711-9N, 717-10N.…
Perform renovations in Building 735-A, Prep/Paint Walls, ceilings, cabinets, install new floor covering, cove base, apply floor finish to new floor…
Steam pipe 3/4 in.-LS-30-3 will be cut at the pipe support after valve LS-V-360.…
Add Inner Canister Closure Station (ICCS) flange heater platform and remove swing arm motor and gearbox.…
Installation of isolation valve for 782-2A.…